(main) Production Goals.
1. Blocks of episodes.
— We’ll take time to try to produce more than a single pilot (first episode). The goal is to make at least the first block of four episodes to allow time to better present the larger, ensemble cast plus the broader mix of tones and notes in the story. (In the current, series outline the first eight episodes are Part 1 of the total, 10-part story).
2. Design & logistics resources.
— Our largest, financial ambition is to afford more than the basics of camera, sound and cast. We’ll also work to fund crew in design and logistics roles. Design crew elevates production with better attention to sets, costumes, et al, and sufficient logistic/production crew means better planning and support, and so better experience for all.
3. On-location filming.
— The goal is to be able to film in the best city/location for the story as possible. Then, once a location is finalized, we’ll work to keep the support crew local to mitigate travel costs; however, ideally the search for the main cast and key department heads won’t be limited to one city or area and so, there will be travel costs to and on location.
4. Sustainability structures.
— All the time, all along the way, we’d allocate funds to further promoting the project, whether it’s campaigns for more episode resources or campaigns for episode distribution. As long as the series is independent, this means funds toward building and maintaining a website/platform, plus cultivating artwork and ideas for promotion and extra income.
(early) Production breakdown.
— There are a thousand ways in which a production budget can get spent. In the map for Horses (and for many productions), it can most simply break down as ~50% of the funds raised goes to cast and crew pay, plus care like housing and travel. The other half gets divided among (1) taxes, (2) sets, (3) gear and (4) platform, with those items laid out in descending order. For more detail, please see the filming table below, which outlines the myriad people and items that can go into not just Horses but any series or film production. Per each department, we’ll summarize the ideas and goals for Wild Horses. Note: the table below is made with a fuller season in mind, not just the four episodes.
A Elements
— Deciding the story and narrative scope.
-
Writing (Research + Scripting)
— The first four episodes of the series have been written, though, they’re up for review after casting and location selection. Before writing the next set, we’d like to fund more writers to offer different voices on the new episodes and to help review the ones written, plus to help research ideas for the future story at large.
Potential team.
Story Director/Editor
Episode Writers (4)
Scripty/Script Supervisor
Primary expense.
Writer’s room
-
Performance (Casting + Development)
— For Horses, we’ll look for fresh faces across the board in the main and support cast. First … because we have to, but also because it’s more exciting that way. For the larger ensembles, we’d like to fund a dedicated Casting Director and funds for adequate rehearsal and development time for all the actors.
Potential team.
Casting Director
Main Cast
Support Cast
Guest Actors
Primary expense.
In-person table read (in pre-production)
-
Direction (Style + Composition)
— In the scenario of a full season, we’d try to hire at least 4 episode directors, ideally one per block of episodes.
Potential team.
Episode Directors
Storyboard Artist(s)
Primary expense.
Adequate prep time
-
Staging (Location + Resources)
— Here, a producer and team would help finalize an filming location/area and then scout and secure main and secondary settings and production resources within it. … For Horses, “staging” can also include building and maintaining a platform (website) for streaming and engagement if the project stays more independent.
Potential team.
Producer (Exec)
Producer (Deputy)
Primary expense.
Location rental(s)
B Elements
— Bringing the concepts written to life.
-
Design (Set Design + Construction)
— Creating the world for everyone to work within. One option for the series is to find space to custom-build two, compact, main sets, which are a hotel lobby and a cafe. Another option is to rent out a small, existing hotel (think 20-30 rooms) and a cafe that can fit the story’s objectives. The number of episodes will ultimately decide which course; we won’t build sets for one episode, for example. In addition to main sets, funds would also cover decor/design for other, featured locations.
Potential team.
Production Designer
Project Manager (Builds)
Set Decorator
Key Scenic
Props Master/Wrangler
Primary expense.
The construction or rental and retrofitting of the main sets
-
Costume (Wardrobe + Vanities)
— Creating total “looks” for the characters, from wardrobe to makeup and hairstyling. Over a season, there will be dozens of looks for all the main and supporting characters, each of whom have a distinct style. We’ve considered allotments, per character, for wardrobe pieces and sufficient funds for hair/makeup.
Potential team.
Costume Designer
Lead Hair & Makeup Artist
Makeup Artist
Hair Stylist
Stylist / Tailor
Primary expense.
Wardrobe for up to 20 characters
-
Stunts (Stunt Design + Practical Effects)
— These elements won’t much apply to Horses; at most, we’ll have scenes with some “hectic” activity. In fact, for Horses, sequences with a lot of extras or unique props can be considered stunts or special effects for us.
Potential team.
Effects Coordinator (Practical)
Set Marshal (Safety)
Primary expense.
Select scenes with a lot of background actors
-
VFX (Visualization + Rendering)
— Again, not really for Horses. If there’s any use in the series it would be small details, here and there.
Potential team.
N/A
Primary expense.
N/A
C Elements
— What the hell you gonna look at?
-
Photography (Camera + Electric)
— Our goal is to budget a little more upfront to try to purchase some (pre-owned) studio gear, like a camera kit, rigs and maybe a lens(es). This prevents the super costly rental loop, plus it allows more flexibility in scheduling and filming, as you’re not at the mercy of a rental house or the potential lack of resources in a location.
Potential team.
Director(s) of Photography
Gaffer(s)
Camera Operator(s)
Key Grip
1st AC
DIT
ELT
Primary expense.
Series camera kit purchase
-
Sound (Recording + Mixing)
— Here we include two facets of sound: first, the recording of dialogue and sounds during filming, and second, editing and mixing those sounds, plus creating new ones, during post-production. Our goal, again, is to try to purchase some sound gear upfront, to cut out the rental loop for future episodes and to be able to customize for production needs.
Potential team.
Sound Director/Designer
Sound Recorder(s)
Boom Operator(s)
Sound Editor
Foley Artist
Sound Asst.
Primary expense.
Series sound kit purchase
-
Editing (Assembly + Color)
— In addition to editing the episodes, we’ll also include here color correction and other, visual fine-tuning in post-production.
Potential team.
Lead Editor
Colorist(s)
Editor(s)
Primary expense.
Maybe partnership with a company for original graphics/credits.
-
Music (Score + Songs)
— For score, we want to create a base “theme” sound, dictated by the setting’s cultural qualities. If it’s Brasil, for example, think Afro and Latin influence. We’ve also considered a small fund for use of songs (likely by less-discovered artists) that can help elevate scenes.
Potential team.
Music Director
2nd Composer
Primary expense.
Maybe music/song rights (depending on if everything else gets sufficient coverage first)
D Elements
— Providing setup and support for all.
-
Line (Budget + Standards)
— A coalition of items from development to distribution that focus on maintaining standards, like planning and adhering to budgets; proper accounting; implementing HR/payroll structures and cultivating safety and footprint guidelines.
Potential team.
Line Producer/Manager
HR/Office Asst.
Series Accountant
Primary expense.
Paying taxes
-
Logistics (Schedule + Communication)
— This is where the master and block schedules get made and then constantly tracked and communicated. It’s where production progress is facilitated by persistently ensuring teams are on the same page and that movement of people and pieces are on point. Every day can bring a surpriiiisse, so it’s important to fund proper coverage here.
Potential team.
AD/Field Director
2nd AD(s)
PA(s)
Primary expense.
A base camp / storage spaces.
-
Travel (Housing + Transportation)
— To mitigate costs, we’ll work to keep support cast and crew local to a location, but the main cast and department heads will likely be spread out. As such, we’ve budgeted for housing and flights for team members. This can also include transportation/vehicles for production.
Potential team.
Producer/Coordinator
Deputy Producer
Driver(s)
Primary expense.
Housing (think modest apartment rentals, not hotel suites)
-
Service (Food + Care)
— We’ve also included funds for grocery and/or prepared meals for crew who will be working on-location (and so away from home) for extended periods, plus funds for basic craft service, sanitation and other supplies.
Potential team.
Service Director/Chef/Caterer
Assistant / Crafty
Set Attendant
Primary expense.
Meals for crew
X Elements
— For a chance at survival.
-
Advertising (Art + Installation)
— This could cover artwork (in a campaign) for the first episodes and for up to a full season. It can include pieces for digital and physical advertising installations (which also must be payed for).
Potential team.
Art Director
Artist(s)
Primary expense.
One large, physical installation
-
Publicity (Social + Events)
— Covers the production of some, short videos (think interviews and games) for YouTube and social media, plus plans for smaller events, like screenings.
Potential team.
Social Producer
Photo/Videographer (BTS)
Primary expense.
A premiere/screening, if feasible
-
Distribution (Streaming + Translations)
— Includes ensuring the series website is sufficient for streaming (if independent) and can also include prepping episodes for international play. With the makeup of the main cast, we’d like to offer translations of episodes and supporting material in a few languages from the start.
Potential team.
Liaison (Translations)
Primary expense.
Maybe partnership with a company for website-build.
-
Commerce (Merchandise + Ventures)
— As long as the project is independent, we’ve got to consider investing in supplementary and creative ways of sustaining the project. This can include making selective merchandise and developing other add-ons/ventures through the website.
Potential team.
Designer (Partnership)
Site Manager (Partnership)
Primary expense.
N/A